IHEP Beijing reports stable ADS LINAC 1 operation with MTCA.4 based LLRF

IHEP Beijing reports stable operation of the ADS injector 1 at 10.7 mA beam current. The Proton LINAC is the first large scale accelerator in China based on a MTCA.4 LLRF system.

Struck furnished SIS8300-L and L2 digitizer AMCs with SIS8900 RTMs including infrastructure (crates, MCH’s and SBC’s) for the project and would like to congratulate the IHEP team on its success.

IHEP Beijing ADS LINAC 1 operation announcement

This entry was posted in Digitizer, LLRF. Bookmark the permalink.

One Response to IHEP Beijing reports stable ADS LINAC 1 operation with MTCA.4 based LLRF

  1. Rong Liu says:

    Thanks very much for the helps from SIS also!
    Rong

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.